Kurskaya NPP-2 (power blocks No.1 and No.2)
Kurchatov, Kursk Region
Status of the object: active
Customer: Kursk branch of JOINT-STOCK COMPANY ASE ENGINEERING COMPANY
Range of works: Temporary buildings and structures erected at the site of Kurskaya NPP-2, including: Preparation of construction site territory. Construction of auxiliary and service facilities. Water, gas and heat supply outdoor networks and structures. Temporary buildings and structures. Manufacturing of structures of a reactor compartment.
Status of the object: active
Customer: Kursk branch of JOINT-STOCK COMPANY ASE ENGINEERING COMPANY
Range of works: Temporary buildings and structures erected at the site of Kurskaya NPP-2, including: Preparation of construction site territory. Construction of auxiliary and service facilities. Water, gas and heat supply outdoor networks and structures. Temporary buildings and structures. Manufacturing of structures of a reactor compartment.
Type of works
Decision on construction of Kurskaya NPP-2 was made to provide prompt replacement of existing power blocks of Kurskaya NPP after expiration of their service life. It is proposed to use new generation power blocks VVER-TOI featuring high safety and improved technical and economic characteristics. It is planned to be start up the first power block in 2021, and the second — in 2023. UECC JSC is interested in extension of its participation in construction of Kurskaya NPP-2 where the company is able to perform any scope of works at main and auxiliary facilities of the block.